Quality Inspector
First-piece approval: after setup, tool change, shift change; check vs drawing and control plan Patrol inspection: at control plan frequency; check CTQ/SC dimensions, finish, appearance Process monitoring: tool wear, offsets, coolant, fixture, program version, work instruction compliance Gauges: use only calibrated gauges; report damaged ones Non-conformance: stop line, red-tag and segregate, contain parts since last good check, inform supervisor and QA Records: inspection reports, SPC data, traceability (lot/heat no.) Compliance: IATF 16949, customer requirements, audit support, 5S Improvement: support 8D, CAPA, Poka-Yoke, Kaizen; help reduce PPM and rejection %
Never pay to get work. If a listing asks for a fee, it is a scam. The ten signs →