Jobs›Civil Engineer, Amritsar

Senior Civil Engineer

Pyramid e Services · Amritsar
PayPay not listed
WhereAmritsar
TypeFulltime
Posted30 Sep25 days ago, via Indeed
Kaam checked
No fee, deposit or pay-to-apply signs
Day work
Physical work
About this job
  • ROAD WORKS ; Responsible for complete road construction including, including
  • Layout marking.
  • Earthwork and subgrade preparation.
  • Compaction testing.
  • GSB laying.
  • WMM laying.
  • Kerb stone installation.
  • PCC works.
  • Asphalt/Interlocking Paver works.
  • Road camber verification.
  • Road level checking.
  • Footpath construction.
  • Speed breaker installation.
  • Road signage coordination.
  • Road marking.
  • Expansion joints where applicable.

Daily Responsibilities

  • Check road levels.
  • Verify compaction.
  • Ensure proper slope.
  • Measure completed quantities.
  • Approve layer thickness.
  • Monitor material consumption.

STORM WATER DRAINAGE

Responsible for

  • Storm water drain layout.
  • Drain excavation.
  • PCC bedding.
  • Drain wall construction.
  • Cover slab installation.
  • Catch pits.
  • Road gully chambers.
  • Outfall connection.
  • Slope verification.
  • Water flow testing.

WATER SUPPLY SYSTEM

Responsible for

  • Fresh water pipeline laying.
  • HDPE/DI/UPVC pipeline supervision.
  • Valve chamber construction.
  • Borewell connection.
  • Pump room coordination.
  • Underground water tank connection.
  • Pressure testing.
  • Leakage testing.
  • Flushing of pipelines.
  • Water meter chamber installation.

SEWERAGE SYSTEM

Sewer line excavation.

  • Bedding preparation.
  • Pipe laying.
  • Joint inspection.
  • Manhole construction.
  • Inspection chambers.
  • Drop manholes.
  • Slope verification.
  • Hydraulic testing.
  • Backfilling supervision.

PLUMBING COORDINATION

Coordinate with Plumbing Contractor regarding

  • Pipe routing.
  • Invert levels.
  • Water supply lines.
  • Sewer lines.
  • Rainwater pipelines.
  • Pump installation.
  • Valve installation.
  • Testing and commissioning.

ELECTRICAL COORDINATION

Coordinate with Electrical Contractor for

  • Underground conduits.
  • Cable trenches.
  • Street light foundations.
  • Electrical pole locations.
  • Junction boxes.
  • Earthing pits.
  • HT/LT cable routing.
  • Transformer foundation.
  • DG foundation.
  • Electrical room civil works.

LANDSCAPE CIVIL WORKS

Supervise

  • Planters.
  • Kerb edging.
  • Tree pits.
  • Irrigation pipeline trenches.
  • Lawn preparation.
  • Pathways.
  • Sitting areas.
  • Water bodies.
  • Fountain civil works.
  • Retaining walls.
  • Boundary plantation works.

BOUNDARY WALL \& GATES

Responsible for

  • Boundary wall layout.
  • Foundation checking.
  • Brick/block masonry.
  • RCC columns.
  • Plastering.
  • Painting coordination.
  • Gate foundation.
  • Security cabin civil works.

BUILDING INFRASTRUCTURE

Monitor

  • Foundations.
  • Plinth works.
  • Columns.
  • Beams.
  • Slabs.
  • Masonry.
  • Plaster.
  • Flooring.
  • Waterproofing.
  • External development.

QUALITY CONTROL

Ensure

  • Material approval before use.
  • Cement quality.
  • Sand quality.
  • Aggregate grading.
  • Concrete mix.
  • Cube testing.
  • Slump testing.
  • Brick quality.
  • Pipe quality.
  • Compaction tests.
  • Road level testing.
  • Material storage.

Maintain

  • Quality Inspection Register.
  • Material Approval Register.
  • Cube Test Register.
  • Site Inspection Register.

MATERIAL MANAGEMENT

Verify

  • Material received.
  • Delivery challans.
  • Quantity received.
  • Storage condition.
  • Daily consumption.
  • Material reconciliation.
  • Stock verification.
  • Wastage control.

Coordinate with Procurement for

  • Cement.
  • Steel.
  • Bricks.
  • Sand.
  • Aggregate.
  • Pipes.
  • Kerb stones.
  • Pavers.
  • Covers.
  • Manhole frames.
  • Electrical conduits.

BILLING \& MEASUREMENTS

Responsible for

  • Measurement Book (MB).
  • Joint measurements.
  • Quantity verification.
  • Contractor bill checking.
  • BOQ verification.
  • Extra item verification.
  • Rate analysis.
  • Work certification.
  • Final measurements.

DRAWING CONTROL

Ensure execution as per latest approved drawings.

Maintain

  • Drawing Register.
  • Revision Register.
  • Site Instruction Register.
  • RFI Register.
  • NCR Register.

Immediately report any drawing discrepancies.

COORDINATION

Coordinate with

  • Architect
  • Structural Consultant
  • MEP Consultant
  • Landscape Consultant
  • Project Coordinator
  • Procurement Department
  • Store Department
  • Accounts
  • Contractors
  • Government Authorities
  • Utility Agencies

SAFETY RESPONSIBILITIES

Ensure

  • PPE usage.
  • Barricading.
  • Safe excavation.
  • Safe lifting.
  • Equipment safety.
  • Road safety.
  • Electrical safety.
  • Toolbox talks.
  • Incident reporting.
  • Housekeeping.

DOCUMENTATION

Maintain

  • DPR (Daily Progress Report)
  • Labour Report
  • Machinery Report
  • Material Consumption Report
  • Concrete Register
  • Cube Register
  • Testing Register
  • Site Order Book
  • Hindrance Register
  • Inspection Register
  • Contractor Progress Report
  • Delay Register
  • Site Photo Record
  • Weekly Progress Report
  • Monthly Progress Report

PROJECT PLANNING

Prepare

  • Weekly targets.
  • Monthly targets.
  • Resource planning.
  • Material planning.
  • Equipment planning.
  • Labour planning.
  • Recovery plans for delays.

HANDOVER \& COMMISSIONING

Responsible for

  • Snag list preparation.
  • Defect rectification.
  • Joint inspections.
  • Final testing.
  • As-built verification.
  • Contractor close-out.
  • Final measurement.
  • Handover documentation.

KEY PERFORMANCE INDICATORS (KPIs)

Civil Engineer – Roles \& Responsibilities (Residential Township Development)

Road Work All road development works including earthwork excavation, filling and compaction, subgrade preparation, Granular Sub Base (GSB), Wet Mix Macadam (WMM), kerb stone installation, PCC works, asphalt or paver block laying, footpaths, road camber, road levels, road signage, speed breakers, road markings, expansion joints, and final finishing, while ensuring proper compaction, alignment, levels, and material consumption.

Storm water drainage works including excavation, PCC bedding, drain construction, catch pits, road gullies, chamber construction, cover slabs, outfall connections, slope verification, water flow testing, and ensuring efficient drainage throughout the project.

  • *Comp

Never pay to get work. If a listing asks for a fee, it is a scam. The ten signs →

Apply on Indeed
Opens in.indeed.com in a new tab